Energy
with a Future

1.789 MW

Installed Capacity

4.638 GWH

Annual Generation 2024

Company Profile

Central Costanera S.A.

We are Central Costanera S.A., a highly diversified plant composed of four single-block conventional cycle units operated by steam, with an installed capacity of 661 MW of power, and two Combined Cycle units — the first with 277 MW of power and the second with 851 MW of power, configured with two gas turbogenerators and one steam turbogenerator.

In this way, Central Costanera totals 1,789 MW of installed capacity, representing 4% of the total power of the SADI and 5% of the country's thermal generation share.

BUSINESS CODE OF CONDUCT → BUSINESS CODE OF CONDUCT FOR THIRD PARTIES →

Location

Our Report and Publications

Annual Report 2025

Sustainability Report 2025

Annual Report 2024

Sustainability Report 2024

Annual Report 2023

Sustainability Report 2023

Annual Report 2022

Sustainability Report 2022

Download PDF


Financial Results

Central Costanera 3Q 2025

Results Release

PDF

Financial statements

Central Costanera 2Q 2025

Results Release

PDF

Financial statements

Central Costanera 1Q 2025

Results Release

PDF

Financial statements

Central Costanera 4Q 2024

Results Release

Financial statements

Central Costanera 3Q 2024

Results Release

Financial statements

Central Costanera 2Q 2024

Results Release

Financial statements

Central Costanera 1Q 2024

Results Release

Financial statements

Central Costanera 4Q 2023

Results Release

Financial statements

Central Costanera 3Q 2023

Results Release

Financial statements

Central Costanera 2Q 2023

Results Release

Financial statements

Central Costanera 1Q 2023

Results Release

Financial statements


CNV Documents

ACTA

DATE

Download

Loading...

ACTA

Download

Loading...

CNV Program

Download

Programa CNV


Risk Ratings

Quarter

DATE

RATING

Download

1T 2024

17 jul. 2024

2

2T 2024

7 oct. 2024

2

3T 2024

20 dic. 2024

2

4T 2023

30 abr. 2024

2

3T 2023

26 dic. 2023

2

2T 2023

11 oct. 2023

2

1T 2023

7 jul. 2023

2


Quote: Stock chart on BYMA

Central Costanera (CECO2.BA) | BYMA



Management and Board of Directors


07/05/2026

Noticia Test

Read more →

13/04/2026

Central Puerto S.A. enters Vaca Muerta and joins the Oil & Gas sector

Read more →

23/12/2025

Central Puerto and IFC Drive Key Energy Investments in Argentina

Read more →

22/12/2025

With the most competitive proposal, Central Puerto renews the concession and remains in charge of the Piedra del Águila Hydroelectric Plant.

Read more →

Get in Touch with Us

To contact →