Energy
with a Future

1.789 MW

Installed Capacity

4.638 GWH

Annual Generation 2024

Company Profile

Central Costanera S.A.

We are Central Costanera S.A., a highly diversified plant composed of four single-block conventional cycle units operated by steam, with an installed capacity of 661 MW of power, and two Combined Cycle units — the first with 277 MW of power and the second with 851 MW of power, configured with two gas turbogenerators and one steam turbogenerator.

In this way, Central Costanera totals 1,789 MW of installed capacity, representing 4% of the total power of the SADI and 5% of the country's thermal generation share.

Location

Our Report and Publications

Annual Report 2024

Sustainability Report 2024

Download PDF

Annual Report 2023

Sustainability Report 2023

Annual Report 2022

Sustainability Report 2022

Download PDF


Financial Results

Central Costanera 2T 2025

Results Release

PDF

Financial statements

Central Costanera 2Q 2025

Results Release

PDF

Financial statements

Central Costanera 1T 2025

Results Release

PDF

Financial statements

Central Costanera 1Q 2025

Results Release

PDF

Financial statements

Central Costanera 4T 2023

Results Release

Financial statements

Central Costanera 4Q 2023

Results Release

Financial statements

Central Costanera 3T 2023

Results Release

Financial statements

Central Costanera 3Q 2023

Results Release

Financial statements

Get in Touch with Us

To contact